Herunterladen Inhalt Inhalt Diese Seite drucken

Transport, Packaging And Storage; Installation, Commissioning, Operation - Tecsis P2600 Betriebsanleitung

Differenzdruckmessgerät
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6. Transport, packaging and storage / 7. Installation

6. Transport, packaging and storage

6.1 Transport
Check pressure gauge for any damage that may have been caused by transport.
Obvious damage must be reported immediately.
6.2 Packaging
Do not remove packaging until just before mounting.
GB
Keep the packaging as it will provide optimum protection during transport (e.g.
change in installation site, sending for repair).
6.3 Storage
Permissible conditions at the place of storage:
Storage temperature: -20 ... +70 °C (optional: -40 ... +70 °C)

7. Installation, commissioning, operation

Mechanical connection
The installation of the differential pressure gauge is made following the installation
recommendations for pressure gauges in accordance with EN 837-2 /7.
Mounting of the process connection according to afixed symbols
high pressure,
Hold against the connection pieces in the case of installation by means of
17 mm screw spanner (installation without holding against the connection
pieces may cause thet measuring system to get loose).
The maximum permissible medium/ambient temperature must not be excee-
ded.
Prior to the installation of the pressure gauge, clean the measuring lines
thoroughly by tapping and blowing or rinsing.
Mount and operate the measuring instruments free from vibration.
Protect measuring instruments from contamination and high temperature
changes.
To avoid foreign matter in the measuring system and the resulting damage to the
system, the pressure gauge must be mounted above the connector.
A ine ilter is to be provided in the
measuring media containing a high level of loating particles.
20
low pressure
- measuring media chamber in the case of
and
Operating instructions

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis