Installation

Mounting
Notes:
Installation shall be performed by qualified personnel and in accordance with local
governing regulations.
For heavy material, only top mounting of paddle switch is recommended.
Compact SITRANS LPS200 is recommended for side mounting on bins for low or
intermediate levels.
For SITRANS LPS200 Cable extension, the maximum pull force of the rope must not
exceed 4 kN (28 kN with reinforced option).
When installing LPS200 with rigid extension kit, ensure product is top mounted and
never side or angle mounted.
WARNINGS:
• This product is designated as a Pressure Accessory per
Directive 97/23/EC, and is not intended for use as a safety device.
• Improper installation may result in loss of process pressure.
SITRANS LPS200 is normally mounted into the vessel top (full detector) or through the
tank wall at the detection level (full, demand or empty detector). SITRANS LPS200 can be
installed through a standard 1¼" NPT or 1½" BSPT pipe coupling, depending on the
chosen process thread.
Food grade material
The materials are available for use under normal and predictable applications (according
to directive 1935/2004 Art. 3). Other conditions can influence safety.