Assemblage
A
A
A
A
A
A
2
3
1
3
A
A
18
10.
Adjustment of the bolts to the
lower door
A - bolt with pad and nut
1. Lower door
Position the bolt into the quadratic holes on the
bottom doors and tighten them together with
washers and nuts.
11.
Installation of the front upper side.
1
A - steel
1. Upper front side
2. Back side
3. Lateral sides
The upper front side it is necessary to hook into the
slots on lateral sides When hook it they must be
attached on inner part with 2 screws. After that, tighten
the inner part and the front upper side with two screws.
Technical instructions Pellet tank CPSP and feeder screw CPPT
sheet screw
3,9 x 9,5 mm
.
EN
4x
4x