4. Place 2 pairs of nuts and bolts in the holes at the
bottom or in the middle of the base (the holes in the
middle can be used to raise the column where there
is a steep slope).
Screw the nut
on the end of
the bolt
5. Slide the column down between the two uprights of the base, and insert the 2 nuts you
have just fixed to the base in the grooves on the column. Take care to leave at least 8
cm between the bottom of the column and the base plinth (for the cables to pass
through).
6. Tighten the 2 lower screws to fix the column, without forcing
them.
7. Unscrew the 2 upper screws and slide them down
into the notches on the base uprights.
8. Tighten the 4 screws.
7.
Wiring the modules according to their instructions
1. Use the space in the bottom of each
module to pass the module's connections
through.
2. Secure the cables using the cable guides.
7
Bolt heads
outside
Space for cables
Cable guides