Herunterladen Inhalt Inhalt Diese Seite drucken

Zodiac HEAT LINE 20 Montage- Und Gebrauchsanleitung Seite 8

Vorschau ausblenden Andere Handbücher für HEAT LINE 20:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 9
CONNECTIONS
Hydraulic connections
Circuit to pool
The exchanger shall be connected in line onto the filtration circuit. Water inlet on the left or the right side by
turning 180°.
Circuit to boiler
The exchanger shall be connected directly to the primary circuit of the boiler supplying constant temperature
(90°C/70°C mandatory). On that circuit, install a circulating pump (not provided) servo-controlled by a
thermostat (not provided) (thermo-well provided on pool water inlet). Circulating pump provided for EC/K
and EC/C models. Install automatic air-bleed on all high points of primary circuit.
Circulation direction
Circulation of both circuits shall be counter-current. Caution, pool water inlet shall always be on the side of
the thermo-well.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Heat line 40Heat line 70

Inhaltsverzeichnis