Herunterladen Inhalt Inhalt Diese Seite drucken

Preparation Before Operation; Before Operating The Unit - Panasonic Indoor CS-V28BKP5 Montageanleitung

Vorschau ausblenden Andere Handbücher für Indoor CS-V28BKP5:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 68

Preparation Before Operation

Airflow Direction Adjustment
2
I Open the front panel.
Hold the panel openers at both
sides and pull up the front panel.
<Note>
Use under the following conditions :
DBT : Dry Bulb Temperature
WBT : Wet Bulb Temperature
Maximum Temperature
Minimum Temperature
7

Before operating the unit

3
I Remove air filter.
Air
filter
Hold the tab to raise up
slightly and then pull down.
I Insert air purifying filter.
Insert the air filters.
Be careful not to
hurt your hands by
metal parts.
Cooling
Indoor
DBT
WBT
32
23
16
11
I Connect the power
Air purifying
filter
(Unit in °C)
Outdoor
DBT
WBT
43
26
16
11
1
supply cord to an
independent power
supply.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Outdoor cu-v28bkp5

Inhaltsverzeichnis