Item 1 – Band (includes spring retainers and a connector)
Item 2 – Power Cord (includes a connector)
Item 3 – Controller (includes two receptacles for connectors)
Figure 1 - Tank Heater components prior to assembly
4. Installation Procedure
1.
Loosen the tank restraint strap of the CCS200 console.
2.
Wrap the band around the N
upwards.
Secure ALL (6) spring retainers as shown in Figure 2.
3.
Figure 2 – Secure spring retainers, top and bottom retainers first.
O tank with connector facing
2
5 of 70