Herunterladen Inhalt Inhalt Diese Seite drucken

Instructions For The User - Dea SPACE Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 75
9 COMMISSIONING
The commissioning phase is extremely important for ensuring maximum system safety, as well as legal and regulatory compliance,
namely with all the requirements of EN 12445, which establishes the testing methods for gate automation units.
DEA System would like to emphasize that any system installation, cleaning or repair operations must only be carried out by qualified
personnel, who must conduct all the tests necessary based on the risks present;
Check prior to activation by repeatedly opening and closing the door and automation unit, and verifying their perfect functionality.
This will allow you to verify that there are no installation or adjustment errors. Check the impact force during the obstacle detection
phase, as required by EN 12445.

9.1 Instructions for the user

Ensure that the owner/user is instructed during commissioning regarding safe operaton fo the machine. It is recommended to
explain or demonstrate the functions directly on the object:
• Safe use of the plant with respect of all safety regulations;
• The position and function of all commands and safety devices and their effect during the various operating conditions;
• The safe use of the manual release mechanism;
• The arrangement and meaning of warnings;
• Operational conditions.
WARNING Using spare parts not indicated by DEA System and/or incorrect re-assembly can create a risk to people, animals and
property and also damage the product. For this reason, always use only the parts indicated by DEA System and scrupulously follow all
assembly instructions.
9.2 Unlocking and Manual operation
In the event of any system anomalies or power failures, release the gear motor (Fig. 5) and manoeuvre the door leaf manually.
WARNING The efficancy and safety of manual operation of the automation is guaranteed by DEA System only if the installation has
been installed correctly and with original accessories.
10 MAINTENANCE
Good preventive maintenance and regular inspection ensure
long working life. In the table below you will find a listo f inspec-
tions/maintenance operations to be programmed and executed
periodically.
Consult the TROUBLE-SHOOTING" table whenever anomalies
are observed in order to find the solution to the problem and con-
tact DEA System directly whenever the solution required is not pro-
vided.
Description
By activating the open or close command, the door does
not move and the operator electric motor does not start to
operate.
By activating the open command, the motor starts to
operate by the gate does not move.
During the movement the operator functions in a jerky man-
ner, it is noisy and stops half-way or does not start.
42
INTERVENTION TYPE
Lightly lubricate the chain and the movable pins.
Remove any excess lubricant. The toothed belt
must not be lubricated. Clean the automation
unit with a dry cloth or a vacuum cleaner
Check screw tightness
Check the tension of any belts or chains (see
TROUBLE-SHOOTING
The operator is not powered correctly; check the connections, the fuses and the conditions
of the power supply cables and replace/repair them, if necessary. If the door does not close,
also check that the photocells operate correctly.
Check that the motor release is closed (see Pic. 5).
Check that the motor does not push in the opposite direction; this could be caused by
inverted wiring.
The door does not have free movement; release the motor and organise the points of rota-
tion.
The power of the gear motor could be insufficient with respect to the features of the door;
check the choice of model.
Pic. 4)
Possible solutions
PERIODICITY
6 months
6 months
6 months

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Space xlSpace xxl

Inhaltsverzeichnis