Herunterladen Inhalt Inhalt Diese Seite drucken

Panasonic CZ-RWSU2N Installationsanleitung Seite 12

Vorschau ausblenden Andere Handbücher für CZ-RWSU2N:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 51
CZ-RWSL2N
Metal Panel
Installing the Operation Panel
1 Remove the 2 screws and remove the cover A from the back of the panel. (Fig. A)
2 Fasten the operation panel to the location shown in the figure below with the 2 supplied screws (4 × 10). (Fig. B)
3 Pass the receiver wiring (6P white connector) through the back of the panel.
Fig. A
Installing the Receiver
1 The cover B is fit in the Cover A. Spread the points as indicated in figure C and remove it.
The tape holding cover B is only to protect it during transport. Remove and discard it.
2 Connect the receiver wiring (6P white connector) that is sticking out from the operation
panel to the receiver and fit the receiver into the panel.
Make sure the 6P white connector is fully plugged in all the way.
3 Pass the lead wire for the receiver through the cutout in the panel and the hole in the
metal panel. Then fasten it to the hole in the metal panel with the plastic clamper. (Fig. D)
4 Attach the cover A.
5 Properly route the lead wire of the operation panel and fasten it with the twist lock. (Fig. B)
6 Install the ceiling panel.
Fig. C
Spread
 For more information about wiring and test runs, see the sections on "Wiring for the Receiver" and
"Test Operation" .
12
Cover A
Cover B
Receiver
Connect
Pass through cutout
Loop extra wiring and fasten with
Fig. B
a twist lock.
Operation panel
Fasten the lead wire to hole in metal panel
Fig. D
Supplied screws (4 × 10)

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cz-rwsl2nCz-rwsd2

Inhaltsverzeichnis