Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Steps Of The Motorized Awning - nemaxx FCA35X Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 17
INSTALLATION STEPS OF MOTORIZED CASSETTE AWNING
Tools required
● Hammer Action Drill
● 14mm Masonry Drill Bit
● Chalk or Pencil
● Spirit Level
● Socket tool set in millimeters
● Adjustable Spanner (not essential, but is helpful during fitting)
WARNING!
This awning is heavy.
Two people are required to lift the awning into position once the brackets are fitted
to the wall.
DO NOT attempt to lift the awning unit into position without assistance as dropping
the unit is likely to cause serious damage to the product and could result in serious
injury.
DO NOT allow children or pets to play in the working area during assembly and
fitting.
Keep the emitter out of children's reach at all times after the awning unit is fitted.
Ensure your hands are kept clean during fitting; this will prevent the awning fabric
and frame becoming dirty.
The awning frame is supplied with a clear plastic wrapping.
This should be removed after fitting.
Plastic bags used in the packing of this product can be dangerous to children and
babies.
Keep out of the reach of babies and children to avoid risks of suffocation.
Before assembly
Check that all the parts shown on the attached parts list are contained within the box.
If any parts are found to be damaged or missing, please contact our customer service.
EN
6
KEN001VKM
v03 • 07.09.2017

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für nemaxx FCA35X

Diese Anleitung auch für:

Fca40xFca45xFca50xFca60x

Inhaltsverzeichnis