Herunterladen Inhalt Inhalt Diese Seite drucken

Prior To Initial Commissioning; Commissioning The Mobile Terminal; Commissioning The Docking Station - ACD GRUPPE M210SE Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für M210SE:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

14 Prior to initial commissioning

14.1 Commissioning the mobile terminal

Please ensure that the battery inserted in the mobile terminal at the factory is fully charged before initial
commissioning. Connect the docking station to the mains using the provided power supply unit and insert the
mobile terminal into the docking station (if included in the scope of delivery).
The battery charging process has been completed when the charge LED shows a green light.
Now you can use the mobile terminal.
Further information on the mobile terminal and the docking station is available in the following chapters.

14.2 Commissioning the docking station

Place the docking station on a flat, sturdy and clean surface away from direct sunlight. Insert the power cable
into the external power supply unit. Insert the DC plug of the power supply unit into the DC socket at the rear
of the docking station (labelled with the DC symbol
The docking station is disconnected from the mains by pulling the
mains plug.
The corresponding power socket must be located near the docking
station and it must be easily accessible.
NOTE
M210SE_Set_Kurzübersicht_Brief_Overview_V1.08_de_en
).
21 / 31

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ds210

Inhaltsverzeichnis