Herunterladen Inhalt Inhalt Diese Seite drucken

Unpacking And Handling; Installing And Connecting To Electricity; Putting The Kiln Into Service - Efco Uhlig 43 000 22 Betriebsanleitung

Kombiofen
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6.

Unpacking and handling

When unpacking or transporting the kiln, always hold the lower side of the kiln to lift it. Never
lift the kiln by holding the door, cable or the mains connector.
Before putting the kiln into service, remove all packaging material from the kiln, the door and
the firing chamber.
7.

Installing and connecting to electricity

Set up the kiln in a well ventilated room, away from other sources of heat and on a fire-proof,
heat-resistant surface. Remove all inflammable material around the kiln. Do not obstruct any
ventilation holes. Due to the high temperatures inside, it is unavoidable that heat radiates corre-
spondingly from the kiln, especially at the door. Place a heat dissipator or a ceramic plate under
the door opening. Do not operate the kiln in the vicinity of easily inflammable or explosive
substances. Choose a place for the kiln, where you can quickly switch it off or disconnect it from
the mains in the case of an emergency.
Connect the plug of the kiln to an earthed socket.
8.

Putting the kiln into service

When using the kiln for the first time, heat it up slowly until the final temperature is reached.
A slight development of smoke is normal when putting the kiln into service.
Choice of two doors with simple DIY installation
Changing doors
a) Remove the door angle
b) Unhook the door

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis