Herunterladen Inhalt Inhalt Diese Seite drucken

HBM TB1A Montageanleitung Seite 14

Referenz-drehmomentmessscheibe
Vorschau ausblenden Andere Handbücher für TB1A:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

14
WARNING
The screw heads (Z), see Fig. 4.3, must not sit on the mounting flange.
With alternating loads: glue all the connection screws into the counter
thread with a screw locking device (medium) to exclude a pretension
loss due to screw slackening.
4. With a cut thread, the adapter material should have a yield point of at least
2
900 N/mm
.
Screwed joint
mounting flange
Fig. 4.3: Screwed joint of the measuring body
5. Before finally fastening the screws, turn the reference torque
measuring disc on the centering until all screw heads are located about
centrically in the connection element's clearance bores. The screw heads
may in no case be in contact with the sides of the mounting flange
clearance bores.
6. Fasten all screws with the specified tightening torque (Table 4.1).
7. For further installation of the shafting, there are eight threaded bores on
the mounting flange. Also use screws of property class 10.9 and fasten
with the tightening torque specified in Table 4.1.
HBM
Z
TB1A
Screwed joint
measuring body
A0162 7.0 en/de/fr

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis