Herunterladen Inhalt Inhalt Diese Seite drucken

Scope Of Supply - Graf one2clean Einbauanleitung

Mehrbehälteranlage
Vorschau ausblenden Andere Handbücher für one2clean:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

1. Scope of supply

Lifter
Pipes
Control unit
(one2clean plus control
without illustration)
The following items are not included in the shipment:
Hoses to supply air from the switch cabinet to the septic tanks. Air hoses (2 x 13 mm, 2 x 19 mm)
are needed.
The hoses can be ordered by the reel:
20-metre PVC hose, black, 13 x 3 mm
20-metre PVC hose, blue, 19 x 3 mm
20-metre PVC hose, transparent, 13 x 3 mm
Core drill Ø 124 mm. This can be purchased from Otto Graf GmbH using article number 202003.
Carat S septic tank and covers must be ordered separately.
1. Scope of supply
Sampling unit
Excess sludge lifter
14 / 36
2 pipe aerators for 7 and 10 PE,
4 pipe aerators for 14 and 18 PE
Accessories
934017
934020
934011

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

One2clean plus

Inhaltsverzeichnis