Herunterladen Inhalt Inhalt Diese Seite drucken

Fault Finding - Husqvarna TS 500 M Betriebs- Und Wartungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 18

FAULT FINDING

In the event of faulty operation refer to the
tables below to find a solution.
• The machine does not work
CAUSES
REMEDIES
Not plugged in
- Make sure that
properly or cable
the supply is
damaged
correctly plugged
in (plug,
extension lead,
etc)
- Check the supply
cable
No mains voltage
- Test or have
tested by an
electrician
(circuit breaker,
plug, etc)
Switch defective,
- Have tested by
motor cable
an electrician or
damaged
contact the
service
department
Motor faulty (no
- Contact the
power, unpleasant
service
smell)
department to
have the motor
replaced
• Difficult starting
CAUSES
REMEDIES
Single phase motor
- Replace the
starting condenser
condenser
Three-phase
- Have it checked
supply not correct
by an electrician
(on 2 phases,
or contact the
motor cable faulty)
service
department
• The pump does not start
CAUSES
REMEDIES
The mains lead is
- Check the mains
not correctly
lead
connected or is
damaged
No voltage in pump
- Check the pump
circuit or mains
circuit and mains
supply circuit
supply circuit
• The pump does not pump water
CAUSES
REMEDIES
An air bubble may
- Holding the pump
have formed inside
of the outlet pipe
the pump body
remove it from
the water and
reimmerse it
The turbine is
- Unscrew the filter
jammed
and, using a
small
screwdriver,
remove all dirt
from the
operating area of
the turbine.
12
Changing the belt
• Loosen the 4 fixing screws and remove
the side cover.
• Using the 19 mm key, loosen the
tensioner screws.
• Using a lever, tighten the belt. If the belt is
not tight enough, bear on the motor, then
again on the tensioner.
13
Blade cooling
• Each saw is fitted with a pump in order to
eliminate dust and overheating.
• The blade is cooled automatically as the
machine starts.
14
Adjustments
• The machine is set before leaving the
factory and no adjustment is necessary.
• However, after shocks, loosening of nuts
and bolts, or sharp movements when
tilting the head, if necessary adjust the
stop screws (J) and check the squareness
(for straight cuts).
15
Important advice
• Retighten the nuts and bolts periodically.
• In the event of a long period of use pay
special attention to the maintenance and
protection of the disc.
• Make sure that sufficient water is sprayed
onto the disc.
• Tighten the disc correctly.
• Make sure that the contact faces of the
disc, the flanges and the spindle are
clean.
The manufacturer declines all
responsibility for loss or damage
resulting from misuse or any
modification,
alteration
powering that does not conform
to the manufacturer's original
specifications.
At the work station, the sound
pressure level may exceed 85 db
(A)
In this case individual protection
measures must be taken.
16
Repairs
Contact your supplier who is
S
entirely at your service to carry
A
V
out repairs in the shortest time at
the best possible price.
17
Spare parts
For rapid delivery of spares and in order to
avoid any wasted time, it is necessary to
remind your supplier of the details shown
on the instruction plate on the machine with
each order, as well as the reference of the
part to be replaced.
00000000
Item number
See exploded view
18
Scrapping
In the event of deterioration and
scrapping of the machine, the
following
items
disposed of in accordance with
the
requirements
legislation in force.
• Main materials :
-
Motor : Aluminium (AL), Steel (AC),
Motor :
Copper (CU), Polyamide (PA)
-
Machine : Steel sheet (AC)
-
Machine :
Cast iron (FT)
or
The instructions for use and spare parts
found in this document are for information
only and are not binding.
As part of our product quality improvement
policy, we reserve the right to make any
and all technical modifications without prior
notice.
(0)
Quantity
must
be
of
the
12

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ts 600 m

Inhaltsverzeichnis