Herunterladen Inhalt Inhalt Diese Seite drucken

Transport; Positioning; Installation Versions - STIEBEL ELTRON SBP 200 E Bedienung Und Installation

Pufferspeicher
Vorschau ausblenden Andere Handbücher für SBP 200 E:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
INSTALLATION
Installation
Minimum clearances
SBP 200-400 E | SBP 200-400 E cool:
The minimum side clearances given enable accessories to be in-
stalled.
The minimum side clearances can be swapped to left or right.
≥100
SBP 700 E | SBP 700 E SOL:
≥100
f Maintain the minimum clearances.
f
7.2

Transport

Material losses
!
We recommend removing the cylinder casing during
transportation to the installation location.
12
| SBP E | SBP E SOL | SBP E cool
≥800
≥100
7.2.1 Removing the cylinder casing
1 Lid
2 Cylinder casing
3 Plinth fascia
f First remove the lid and then the plinth fascia.
f
7.2.2 SBP 700 E | SBP 700 E SOL
These appliances have side insulation sections that can be
removed. This will make transportation through narrow doors
and passageways easier.
f Remove the retaining straps by opening the closures.
f
When reattaching the retaining straps, ensure that the closures
are near a joint between the casing parts.
7.3

Positioning

7.3.1 SBP 200-400
f Fit the adjustable feet provided, these are already fitted on
f
SBP E cool appliances.
f Use the adjustable feet to compensate for any unevenness in
f
the floor.
7.3.2 SBP 700
These appliances do not have adjustable feet. The floor must be
level.
7.4

Installation versions

7.4.1 Installing the immersion heater
The immersion heater is used for electric booster heating.
- With the SBP 200-400 the immersion heater can be mounted
on the r.h. or l.h. side.
- One or two immersion heaters can be mounted with the
SBP 700.
1
2
3
www.stiebel-eltron.com

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis