Herunterladen Inhalt Inhalt Diese Seite drucken

Cadac Safari Chef 2 Gebrauchsanweisung Seite 4

Vorschau ausblenden Andere Handbücher für Safari Chef 2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 9
If there is a leak on your appliance (smell of gas), close the cylinder valve immediately and take it into a fl ame free location where the leak
may be detected and stopped. If you wish to check for leaks on your appliance, do it outside. Do not try to detect leaks using a fl ame; use
soapy water.
The correct way is to smear the joints e.g. where the stem fi ts into the cylinder, with
soapy water.
If bubbles form, then there is a gas leak. Immediately turn off the gas supply by
closing the control valve on the gas container and then the appliance valve. Check
that all the connections are properly fi tted. Re-check with soapy water.
If a gas leak persists, return the product to your CADAC dealer for inspection / repair.
Use Outdoors Only.
3. Assembly Instructions
WARNING: The legs are spring loaded. Opening and closing of the legs must
be done in a controlled manner to avoid personal injury or damage to your
Safari Chef 2.
To open the legs, turn the unit upside-down and hold the legs down while lifting
each leg individually. You will hear a "click" if the leg(s) has located correctly.
To fold the legs back, securely hold the leg and push the Leg Release Clip down.
Then push the legs in-ward to its closed position (Fig 6). This needs to be done
sequentially to optimise space. First the Right front leg (1), Then the
Left front leg (2), and lastly the rear Leg (3) (Fig 4b).
Before connecting the gas supply, fi rstly check that the appliance valve is in the off
position by turning the control knob fully clockwise (See Fig. 2).
I 3B/P (30), I 3+ (28-30/37) and I 3B/P (37) Appliance categories: Fit the Valve
Tailpiece onto the Valve (Fig.5) by screwing it on in an anti-clockwise direction.
Push an 8mm inside diameter Hose onto the Valve Tailpiece until it is properly
seated. On the other end attach a suitable 30mbar low-pressure (I 3B/P (30) and
I 3+ (28-30/37) Butane confi gurations) or 37mBar low-pressure regulator (I 3+
(28-30/37) Propane confi guration), again making sure that the hose is well seated.
The hose used must comply with BS 3212 / SABS 1156-2 or equivalent.
I 3B/P (50) Appliance category: Screw a Hose with the correct threaded fi ttings on
each end, onto the left hand ¼"BSP thread of the Valve. Attach a suitable 50mbar
low-pressure regulator on the other end of the hose. The hose used must comply
with DIN 4815 part 2 or equivalent.
Note: The hose and regulator are not supplied with the appliance. For details,
contact your local stockist.
The hose length should be no less than 800 mm and shall not exceed 1.5 m.
Check the expiry date on the hose and replace when necessary or when national
conditions require it. Do not twist or pinch
hose.
Your appliance is now ready for use.
503-0453 LEV17 - (6540L1, 5640L0) Safari Chef 2 LP - User Manual - (EU + SA).indd 2
Fig. 4b
2 2
Hose
Regulator
Fit hose
clamp
here
Fig. 4a
Fig. 4a
28-30 & 37mbar
ONLY
Fig. 4b
Fig. 4c
GB
Seal
Cylinder Valve
Fig. 1
OFF
Fig. 2
Fig. 3
Fig. 5
12/04/2017 08:01:45

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

6540l06540l1

Inhaltsverzeichnis