EN
STEP 05
1. ATTACH ARM REST BEAM (T&U) TO LEFT VERTICAL BEAM (G) WITH TWO
SCREWS M10*70 AND FOUR WASHERS AND TWO NUTS (29) AS SHOWN.
2. ATTACH HANDLE GRIP (7) TO ARM REST BEAM (T&U) WITH SCREW M10*20 AND
WASHER (24) AS SHOWN.
3. ATTACH ARM REST CUSHION (4) TO EACH ARM REST BEAM (T&U) WITH FOUR
SCREWS M8*65 AND WASHERS (33) AS SHOWN.
4. ATTACH SMALL BACK CUSHION (3) TO LEFT VERTICAL BEAM (G) WITH TWO
SCREWS M8*65 AND WASHERS (33) AS SHOWN.
5. ATTACH STEPPER (AJ) AND ADJUSTABLE CYLINDER (9) TO LEFT VERTICAL BEAM
(G) WITH LOCK NUT M12 AND WASHER (25).
6. ATTACH ADJUSTABLE CYLINDER (9) TO THE STEPPER (AJ) WITH SCREW M8*40
AND WASHER AND LOCK NUT (39).
64