Herunterladen Inhalt Inhalt Diese Seite drucken

Saeco DA 7P Handbuch Seite 17

Heissgetränkeautomat
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 34
5.4 Set up
• Fill the water tank (2) (except for those machines directly connected to the waterline), the coffee bean
hopper (4) and the soluble product bin (1), paying attention not to fill the latter over 2/3 of their max.
3
1
2
1 0
8
6
capacity and to set them in the right position (Pos.1 Tea or
other drinks, Pos.2 Chocolate, Pos.3 Milk) (Fig.B).
• Turn the main switch located on the machine rear side, to
position 1 and then fill the water system, proceeding as
follows:
• Open the front door panel and override the sensor switch
(6) by inserting the "orange key " (7) (fig.C).
• Caution: This operation, which is necessary for the machine
installation, overrides the safety system which powers off
the unit when the front door panel is opened. Therefore, it
is to be carried out by trained personnel only, aware of
Fig. B
the risk run when working with equipments under
voltage.
• Hold down the rinse switch (10) until water readily flows
from one of the dispensing tubes (29).
• Calibration of coffee grinder
Position the coffee grinding adjustment to one of the
following reccomended settings, turning the grinder
adjustment ring (33) (Fig.D):
Italy : 4-7
Spain : 5-8
France - Switzerland : 5-8
Germany - Austria : 6-9
USA - Canada: 6-14
Fig.C
• Insert the necessary coins, select the desired product and
check the product quality. If coffee flows too slow, adjust the
grinder to a courser setting. On the contrary, if coffee flows
too fast, adjust the grinder to a finer setting.
• Attention: Brew one or two coffees between adjustments to
purge coffee with the old grind setting from the grinder
• Make sure that the soluble product dispensers (26) are
open, take away the "orange key"(7) and close the door.
• Wait until the green LED "Ready for use"is illuminated (if all
red LEDS next to the selection buttons are illuminated, the
machine has not reached the right temperature).
• Insert the correct change and check proper functioning of
Fig. D
the machine by dispensing some hot beverages.
N.B.: In order to change the beverage features (concentration,
coffee volume and selection price) use the 7P Programmer.
English
17

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis