Herunterladen Diese Seite drucken

Quax LOFT Bauanleitung Seite 41

Vorschau ausblenden Andere Handbücher für LOFT:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

LOFT
54F 03 00x
Step 12 - Installing the drawers : Use the assembled parts of step 11
Please start with the lower drawer. Pull the sliders out of the cabinet, place an assembled drawer against
the rear stop on the sliders and push the drawer over the front stoppers of the sliders. Repeat with the top
drawer.
Step 13 - Wall fi xing (Optional) : Use the mounted chest of drawers, the wall plug T, the angular profi le
S, the split screw V, two washer D and wood screw A
Mark the pace the chest occupies on the wall. Draw a cross in the middle of the width and 40 mm from the
top of the marking. Check the diameter of the wall plug (T) and drill the hole. Fasten the angular profi le
(S) with a washer (D) and the split screw (V). Remove the upper drawer from the chest. Slide the chest of
drawers over the angular profi le through the opening in the upper back. Attach the profi le to the chest of
drawers with a washer and a wood screw (A). Reinstall the drawer.
Commode met 2 laden en 3 vakken
Kommode mit 2 Schubladen und 3 Fächern
Commode à 2 tiroirs et 3 compartiments
Chest with 2 drawers and 3 compartments
Quax
First dreams
®
First steps
41

Werbung

loading