Herunterladen Diese Seite drucken

Quax LOFT Bauanleitung Seite 35

Vorschau ausblenden Andere Handbücher für LOFT:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

LOFT
54F 03 00x
4. Assembling the chest of drawers
Step 1 : Use both end sides P1B and P2J, four slider parts N, twenty bolts A, eight wooden dowels L, four
connectors G, four eccentrics H and two push systems R
Place the outer sliders (N) on the drillings of the end sides (P1B and P2J). Attach each slider with two bolts
(A). Tighten two connectors (G) in the drillings in the middle of one side. Push two wooden dowels (L) into
the holes of the top and bottom edge of a side. Push two eccentrics (H) into the drillings on top of the side.
Disassemble the push systems (R). Place the mounting plate on the holes under the sliders. Attach each
fi xing plate with two bolts (A). Push the system back onto its holder.
Step 2 : Use the top P3, eight connectors G and three nuts K
Tighten the connectors (G) in the drillings at the underside of the top (P3). Push the nuts (K) in their drill-
ings.
Commode met 2 laden en 3 vakken
Kommode mit 2 Schubladen und 3 Fächern
Commode à 2 tiroirs et 3 compartiments
Chest with 2 drawers and 3 compartments
Quax
Quax
First dreams
First dreams
®
®
First steps
First steps
35

Werbung

loading