The hydraulic suction or discharge connection uses flexible piping of Ø 6 mm intern. It is advised to
install the non-return valve (provided) on the discharge connection.
Once installed, make an operation test with the test switch under the pump. The pump will run for about
3 minutes.
Cleaning:
Periodicity: every 6 months, latest at the beginning of the season.
Check the Santoprene® pipe regularly and change it
every 12 months or in the event of premature wear.
When new pipe is mounted (1 replacement provided with the pump) add a light film of silicone grease
around it. Before closing the lid check the general state of pump (rollers, etc).
Once maintenance finished make an operation test.

Warranty:

One (1) year from delivery date. This warranty concerns only parts with material defects or
manufacturing faults and is confined to the replacement or repair of the defective parts. Cost of labour
and any secondary failures cannot be considered as basis for a claim in any case.
All equipment returned must be complete and accompanied by a note indicating the observed fault.
We decline any responsibility if installation is not in conformity, if the specifications are not satisfied or
the equipment is not maintained.
BKL Air Conditioner GmbH Hanns-Martin-Schleyer-Str. 30 a 47877 Willich - Münchheide II
Tel. 0 21 54 / 92 21 - 50 Fax 0 21 54 / 92 21 - 99 e-mail: bkl@bkl-klima.de internet www.bkl-klima.de