Herunterladen Inhalt Inhalt Diese Seite drucken

NARVI SOFTY 6,8kW Installation Und Betriebsanleitung Seite 23

Vorschau ausblenden Andere Handbücher für SOFTY 6,8kW:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 24
7. CONSTRUCTION OF THE STEAM ROOM:
-
The steam room must be well insulated, especially the ceiling, through which most of the steam
escapes. Because of the humidity, it is recommended the insulation be covered with a moisture
resistant material, for instance aluminum foil. Wood must always be used to panel the walls.
8. PROTECTIVE BARRIER:
-
A protective barrier may be built around the heater if necessary. In this case, you should
definitely adhere to the minimum clearances from structures made of flammable materials.
9. IMPORTANT ADDITIONAL INSTRUCTIONS:
-
You should be careful in the vicinity of the hot heater, because the stones and
metal parts of the heater may cause burns.
-
Only a small amount of water should be thrown onto the heater stones, because
the steaming water is scalding hot.
-
This equipment is not to be used by children or people whose physical and
psychological traits, mental functions, lack of experience or knowledge may hinder
the safe operation of the equipment, if the person who is responsible for safety
cannot supervise them or instruct them in the use of the equipment.
-
Children may not be left unsupervised and they should be supervised to make sure
they do not play with the equipment.
-
Always inspect the steam room before plugging in the heater.
-
The improperly filed stone container is a fire hazard.
-
Covering the stove will cause a fire hazard.
When measuring the insulation barrier of the heater, some leakage may occur, which is
caused by the humidity that has seeped into the insulation material during transport
or warehousing. The moisture will evaporate after the heater is heated a few times.
Do not connect the power supply for the electric heater through a fault current protection!
10. CONNECTION SCHEME:
+12V
X1-1
1
J7
J8
ON/OFF
Switch
L1
L1
400V 3N~
Display
NTC
CTL
--
X1-2
X1-3
X1-4
Control unit
2
3
4
Disp.
N
N
CTL L2
L2
PE
Overheating
protection
A1
A2
B1
B2
NTC
YKS.
PE L3
L3
Control of the electric heating
NTC
VA1 VA2 VA3

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Softy 9kwSofty 105kw

Inhaltsverzeichnis