Herunterladen Diese Seite drucken

Napoleon BIM730 Montageanweisungen Seite 7

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 33
4. BUILT-IN SIDE BURNER INSTRUCTIONS
1. Fit the side burner frame into the opening. The frame should be attached to the opening to prevent any future movement (fasten-
ers not included).
2. Ensure that there is at least 32cm
3. Set the side burner into the frame.
4. Connect the gas supply to the side burner valve. Leak test the entire installation before operating the unit.
2
of opening in the bottom of the cut out, for combustion air.
N280-0003P (BLACK)
N280-0004 (STN STL)

Werbung

loading

Diese Anleitung auch für:

Bim485Bim605