Herunterladen Inhalt Inhalt Diese Seite drucken

Iso-Tech IIT-2302 Bedienungsanleitung Seite 7

Isolations und durchgangstester
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 32
Mains switch open
Temporary
Test at socket
link
between L and E
Typical arrangement for measuring the continuity of
protective conductors.
 Warning! Verify the circuit is de-energised before
testing.
All fuses in or circuit
breakers closed
Mains Switch Open
Typical arrangement for insulation testing.
 Warning! Verify the circuit is de-energised before
testing.
— 6 —
Equipment disconnected
Switches
Lamps out
closed
Reading not less than
0.5 MΩ

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis