Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Before Initial Operation - Schaub Lorenz SL 130SGR TT LA++ Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Adjustable feet
Clockwise → down
Spacers
Depending on model, the appliance is
supplied with two plastic spacers. After
installation
of
these
appliance cannot be pushed against the
wall to maintain proper ventilation.
Insert the spacers into the relevant
openings on the back of the appliance,
then turn by 45
to the right or left
0

4. Operation

1
Thermostat
3
Crisper
5
Door trays

4.1 Before initial operation

1. Clean the appliance thoroughly. Be very careful especially inside the appliance.
2. After having installed the appliance wait 4-6 hours before you connect it
to the mains.
3. Set the thermostat to position 5.
spacers,
the
.
2
4
6
Anti-clockwise → up
Shelves
Door trays
Door trays
27

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis