Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 6
1
Instructions for use
A
B Ready lamp
C Start panel
D Wait lamp
E
F
G Cooling stand

Operation

How to achieve optimal results in ther-
mal binding:
1. Connect the appliance to the power
2. After approx. 2 minutes, the appli-
u-
ies
r
3. Select the right Peach thermal
4. Take the folder and tap it once or
Number of sheets (80g/m
Folders thickness in mm
* Repeat 5 times step 6 and 7. Take the folder and tap it four or five times with
m
its spine against the table or desk surface. Afterwards proceed with step 8.
3T Supplies AG, Division Peach
Chaltenbodenstr. 6
CH-8834 Schindellegi
support@peach.info
www.3ppp3.com
On/off switch
Cooling slots
Binding tray
supply and press the on/off switch
(A). The red Wait lamp (D) lights up:
the appliance heats up to operating
temperature.
ance has reached its optimal opera-
ting temperature. The green Ready
lamp (B) lights up. The appliance tells
you that it is ready by emitting an
acoustic signal.
binding folder and put the pages
that you want to bind into this.
twice with its spine against the table
or desk surface.
)
2
15
20
30
1.5
2
3
5. Put the prepared thermal binding
folder into the binding tray (F) until
the spine of the folder touches the
hot plate.
6. Now press Start (C); the Ready lamp
(B) goes out and the Wait lamp (D)
lights up.
7. After approx. 40 seconds, the Ready
lamp (B) lights up. The binding
process is now completed.
8. Then put the bound folder in the
cooling stand (G) so that the binding
can cool down.
9. After 60 seconds, you will hold the
perfect binding in your hand.
10. Once you have done all your binding,
turn the appliance off by pressing the
on/off switch (A).
40
60
80
100
4
6
8
10
*
120
300
*
12
33
5

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis