Herunterladen Inhalt Inhalt Diese Seite drucken

Instructions For The Installer; Terminal Block; Electrical Connection - ZANKER ZKB 7613 Bedienungsanleitung

Einbau-backofen
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Electrolux

Instructions for the Installer

The instructions given below are
designed specifically for a qualified
installer and should aid him or her to
perform all installation, adjustment, and
maintenance operations with absolute
precision and in compliance with all
current legislation and regulations. We
strongly
recommend
operations for the installation of your
cooker be carryed out by Qualified Per-
sonnel in accordance with existing
rules and regulations.

Electrical connection

Before connecting to the electrical supply, please
make sure:
- The fuse and the domestic electrical
installation must be designed for the
max. load of the appliance (see rating
plate).
- The domestic electrical installation must
be equipped with a proper earth
connection in accordance with the
regulations in force.
- The socket or the multi-pole off switch
must be easy to access after the
appliance has been installed.
The appliance is supplied with the plug attached.
The mains cable and plug as supplied are to be
connected to a shockproof socket (230 V~, 50
Hz). The shockproof socket must be installed in
accordance with the regulations.
The following types of mains cable are suitable,
taking the necessary rated cross section into
account: H07 RN-F, H05 RN-F, H05 RR-F, H05
VV-F, H05 V2V2-F (T90), H05 BB-F.
If the appliance is connected without a plug, or if the
plug is not accessible, a multi-pole off switch (e.g.
fuses, circuit breaker) with a minimum gap of 3 mm
48
between the contacts must be installed between the
appliance and mains cable. The switch must not
interrupt the earth wire at any point. The yellow-
green earth wire should be 2-3 cm longer than all
other cables.
The connection cable must in any case be laid out
so that at no point does it reach 50°C (over room
that
all
temperature).
After the connection has been carried out, the
heating elements must be tested by being operated
for about 3 minutes.

Terminal block

The oven is fitted with an easily accessible
terminal block (Fig. 7) which is designed to
operate with a single-phase power supply of 230
V.
Letter L
Letter N
or E
-
Live terminal
-
Neutral terminal
-
Earth terminal
Fig. 7

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis