Herunterladen Inhalt Inhalt Diese Seite drucken

AEG 99553GM Benutzerinformation Seite 22

Gas-kochfeld
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

22
Installation
Make sure that the gas supply pressure of the appliance obeys the recommended values.
The adjustable connection is fixed to the comprehensive ramp by means of a threaded nut
G 1/2". All the components shown in the figure have already been assembled in the factory.
The appliance, before leaving the factory, has been tested in order to give you the best re-
sults.
1
End of shaft with nut
2
Washer
3
Elbow
Flexible nonmetal pipes connection:
If it is possible to easily control the connection in its full area, you can use a flexible pipe.
Tightly attach the flexible pipe by clamps.
Liquid gas : use the rubber pipe holder. Always engage the gasket. Then continue with the
gas connection. The flexible pipe is prepared for apply when:
– it can not get hot more than room temperature, higher than 30°C;
– it is no longer than 1500 mm;
– it shows no throttles;
– it is not subject to traction or torsion;
– it does not get in touch with cutting edges or corners;
– it can be easily examined in order to check its condition.
The control of preservation of the flexible pipe consists in checking that:
– it does not show cracks, cuts, marks of burnings on the two ends and on its full length;
– the material is not hardened, but shows its correct elasticity;
– the fastening clamps are not rusted;
– expired term is not due.
If one or more defects are visible, do not repair the pipe, but replace it.
When installation is complete, make sure that the seal of each pipe fitting is correct. Use a
soapy solution, not a flame !
1
2
3

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis