Herunterladen Inhalt Inhalt Diese Seite drucken

Floor Mounting - EuroLite LED PMC-8x30WCOB RGB MFL Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

The device has to be installed out of the reach of people.
If the device shall be lowered from the ceiling or high joists, professional trussing systems have to be used.
The device must never be fixed swinging freely in the room.
Caution: Devices in hanging installations may cause severe injuries when crashing down! If you have
doubts concerning the safety of a possible installation, do NOT install the device!
Before rigging make sure that the installation area can hold a minimum point load of 10 times the device's
weight.
When installing the device, make sure there is no highly-inflammable
material (decoration articles, etc.) within a distance of min. 0.5 m.
Mount the device to your trussing system using an appropriate clamp.
For overhead use, always install an appropriate safety bond.
You must only use safety bonds and quick links complying with DIN 56927, shackles complying with DIN EN
1677-1 and BGV C1 carbines. The safety bonds, quick links, shackles and the carbines must be sufficiently
dimensioned and used correctly in accordance with the latest industrial safety regulations (e. g. BGV C1,
BGI 810-3).
Please note: for overhead rigging in public or industrial areas, a series of safety instructions have to be
followed that this manual can only give in part. The operator must therefore inform himself on the current
safety instructions and consider them.
The manufacturer cannot be made liable for damages caused by incorrect installations or insufficient safety
precautions!
Pull the safety bond through the attachment eyelet and over the trussing system or a safe fixation spot.
Insert the end in the quick link and tighten the safety screw.
The maximum drop distance must never exceed 20 cm.
A safety bond which already held the strain of a crash or which is defective must not be used again.
Adjust the desired inclination-angle via the mounting-bracket and tighten the fixation screws.

Floor Mounting

Before attaching the device, make sure that the installation area can hold a minimum point load of 10 times
the device's weight.
The device must only be installed absolutely planar at a vibration-free, oscillation-free and fire-resistant
location. Make sure that the device is installed absolutely planar by using a water-level.
The device must be installed out of the reach of people.
The device must always be installed via all fixation holes. Do only use appropriate screws and make sure
that the screws are properly connected with the ground.
The durability of the installation depends very much on the material used at the installation area (building
material) such as wood, concrete, gas concrete, brick etc. This is why the fixing material must be chosen to
suit the wall material. Always ask a specialist for the correct plug/screw combination indicating the maximum
load and the building material.
Procedure:
Step 1: The holes for the installation are on the mounting bracket.
Step 2: Hold the mounting bracket onto the location where the device is to be installed.
Step 3: Mark the boreholes with a pen or a suitable tool.
Step 4: Drill the holes.
Step 5: Hold the mounting bracket in the desired position and tighten the appropriate screws.
DANGER OF FIRE!
23/32
00080137.DOC, Version 1.0

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis