Keep exchanged lamp in a protective container and remove accordingly.
During the operation, the lamp reaches temperatures of up to 600° C.
Before replacing the lamp, unplug mains lead and let the lamp cool down (approx. 15 minutes).
During the installation do not touch the glass-bulbs bare-handed! Please follow the lamp manufacturer's
notes!
Do not install lamps with a higher wattage! Lamps with a higher wattage generate temperatures the device
was not designed for. Damages caused by non-observance are not subject to warranty.
Because of the nature of the extreme heat associated with the 5R discharge lamp and the tight nature
of the internal optical system it is imperative that the lamp be replaced every 2000 hours. This is
done to protect the internal optical system as well as prevent accidental lamp explosion, which could
lead to hot glass particles falling from the fixture.
Procedure:
Step 1: Unscrew the three screws of the lamp system and carefully remove the lamp system from the
housing.
Step 2: If replacing the lamp, remove the old lamp from the lamp holder. Grip the lamp at the ceramic
base and loose the lamp carefully from the frame until you can remove the lamp. Remove the
lamp from the lamp holder. Remove the two blade terminals from the lamp base.
Step 3: Attach the blade terminals at the base of the new lamp. Carefully insert the new lamp into the
lamp holder.
Step 4: Replace the lamp system in the housing and tighten the three screws of the lamp system.
Attention: Please note, the 5R lamp is not a hot-restrike type. You must wait approximately 15
minutes before you can attempt to strike the lamp once it has been turned off!

Overhead rigging

Please consider the EN 60598-2-17and the respective national standards during the installation!
The installation must only be carried out by an authorized dealer!
The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the device staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
Do not operate this device with opened cover!
DANGER TO LIFE!