Herunterladen Inhalt Inhalt Diese Seite drucken

EuroLite MD-1015 Rotary Motor Bedienungsanleitung Seite 10

Vorschau ausblenden Andere Handbücher für MD-1015 Rotary Motor:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

When rigging, derigging or servicing the fixture staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
Procedure:
The mirrorball should be installed outside areas where persons may walk by or be seated.
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to)
calculating working load limits, installation material being used, and periodic safety inspection of all
installation material and the mirrorball. If you lack these qualifications, do not attempt the installation yourself,
but instead use a professional structural rigger. Improper installation can result in bodily injury and.or
damage to property.
The installation spot must be chose in a way that the motor can be installed in an absolutely horizontal
position.
The motor and the mirrorball have to be installed out of the reach of people.
If the motor shall be lowered from the ceiling or high joists, professional trussing systems have to be used.
The motor must never be fixed swinging freely in the room.
Caution: Mirrorballs may cause severe injuries when crashing down! If you have doubts concerning the
safety of a possible installation, do NOT install the motor!
Before rigging make sure that the installation area has to hold a minimum of 30 kg point load.
Please install the mirror ball motor via all 4 fixation holes.
Do only use appropriate screws and make sure that the srews are properly connected with the ground.
Connection to the mains
For the version with power-plug:
Connect the device with the power plug to the mains.
For the version without power-plug:
Connect the device with the 3-pole power supply cable to the mains.
The occupation of the connection-cables is as follows:
Cable
Pin
Brown
Live
Blue
Neutral
Yellow/Green
Earth
The earth has to be connected!
The mirrorball has to be connected via an appropriate installation (see above) with the motor. We
recommend to use the Chain for Mirrorballs up to 50 cm certified, 33 cm, No. 50301612 or Chain for
Mirrorballs up to 50 cm certified, 100 cm, No. 50301614.
The installation material must never include abrading material e. g. steel cables in order to avoid
International
L
N
material wearing.
10

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis