Herunterladen Inhalt Inhalt Diese Seite drucken

Capacity Measurement (Capacitor Test) - Unitest Hexagon 310 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Capacity Measurement
5.2 Capacity Measurement
Prior to any capacitor test, it
must be ensured, that the
capacitor to be tested is com-
pletely discharged. Failure to
comply with this prescription
can lead to dangerous corpo-
ral user injuries or cause
instrument damage. Additio-
nally, charged capacitors fal-
sify the measurement result.
Charged capacitors have to be
discharged using a high-ohm
resistance (not via short-
circuit !).
When dealing with polarised
capacitors, connect "-" pole
to
the
multimeter
COM
socket.
Resistors and semiconductor
Z
paths in parallel to the capacitor
cause
falsified
measurement
results.
52
UNITEST Hexagon 330 and
UNITEST Hexagon 340:
❿ Select measurement range
via measurement function selec-
tion switch.
❿ Connect the black test lead to
the COM socket and the red
test
lead
to
the
Temp/
/
/
socket.
❿ The capacity test is pre-set. If
the diode symbol appears on
the display the key
used to switch to capacity test.
UNITEST Hexagon 310 and
UNITEST Hexagon 320:
❿ Select measurement range
via measurement function selec-
tion switch.
❿ Connect the black test lead to
the COM socket and the red
test lead to the
/
socket.
❿ Connect test leads to UUT.
❿ Read the measurement result
displayed on the screen.
is
/

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Hexagon 320Hexagon 340Hexagon 330

Inhaltsverzeichnis