Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Maintenance And Servicing / Cleaning; Repairs - WIKA 732.02.100 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3. Technical data ... 6. Repairs
Permissible vibratory stress at the mounting location
T
As a matter of principle the instruments should only be mounted at locations
without vibratory stresses
T
Where required, a decoupling from the mounting location can be achieved
e.g. by a flexible connecting line from the measuring point to the pressure
gauge and mounting via a measuring instrument bracket.
T
If this is not possible, the following limits must not be exceeded:
Dry gauges:
(Model 732)
Liquid-filled gauges:
(Model 733)
The liquid filling has to be checked on a regular basis.
The liquid level must not drop below 75% of the gauge diameter.

4. Commissioning

During the commissioning process pressure peaks must be absolutely avoided.
Open the shut-off valves slowly.

5. Maintenance and servicing / cleaning

The instruments require no maintenance or servicing.
The indicator should be checked once or twice every 12 months.
The instrument must be disconnected from the process to check with a
pressure testing device.
The instruments should be cleaned with a damp cloth moistened with soap
solution.

6. Repairs

Repairs are to be only carried out by the manufacturer or appropriately trained
personnel.
For further details see WIKA data sheet PM 07.02
WIKA Operating instructions pressure gauges Model 73X.02.100 per ATEX
Frequency range < 150 Hz
Acceleration < 0.7 g (7 m/s
Frequency range < 150 Hz
Acceleration < 4 g (40 m/s
)
2
)
2
GB
7

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

733.02.100

Inhaltsverzeichnis