Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; A) Connection To The Public Mains; B) Lead Battery Connection (Optional) - Renkforce MAC-608 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

9. Installation

The product must only be installed by a qualified electrical specialist (e.g. electrician)!
Improper work, carried out on the mains voltage, endangers not only your life but also the life
of others! If you do not have the expertise required for installation, do not install the device
yourself but ask a specialist.
Remember that the alarm system must be voltage-free during installation! Turn off the power
on all poles of the mains supply by removing the respective electric circuit fuse or switching
off the circuit breaker. Also switch off the corresponding FI circuit breaker. Then check that the
mains connection is free of current, e.g. with an appropriate tester.

a) Connection to the Public Mains

There is a screw clamp for three-wire cable connections in the housing of the alarm system. Use it to con-
nect the alarm system to the mains voltage.
Observe that you always connect the right cables (marked in colour) with each other in order to not dam-
age the product! For this, connect the individual wires to the screw clamp sol that the colours of the insula-
tions match: L = phase (brown cable), N = neutral (blue cable) and PE = protective ground (yellow-green
cable). For this, push the stripped ends of the individual wires into the intended contacts and fasten them
with the screws. Then secure the mains cable from slipping out by tightly screwing it to the clamp under
the black plastic bridge.
b) Lead Battery Connection
To ensure smooth operation of the alarm system even during power failure, a lead acid battery (12 V/DC,
with minimum 1.2 Ah) must be connected to the system. For this, use the two screw connections at the red
("+"-pole) and black cables ("-"-pole) – observe correct polarity to avoid damage to the product.
Activate the operational voltage only after completing all connections and making the indivi-
dual settings of the DIP switches!
27

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis