Herunterladen Inhalt Inhalt Diese Seite drucken

Dip Switch Settings - STG-BEIKIRCH WRZ 40M-4G Bedienungsanleitung

Wind-/regenmeldezentrale
Vorschau ausblenden Andere Handbücher für WRZ 40M-4G:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Wind-/Rain-control unit WRZ 40M-4G
6.6
Connection 4 x Wind-/rain control units (master/slave operation),
1 x key switch 24 V and DIP switch settings
The WRZ 40M-4G offers the possibility of connecting three further control units through a bus line. This allows a master
/ slave operation. The main control unit is the master. The main control unit issued orders to all other slave control units
via a bus line. Also the wind / rain message is forwarded via the bus line to the slave panels.
Each control unit must be supplied with power (230V AC). On the slave control units individual DIP switch settings have
to be made. About a key switch 24 V, which is connected to the master control unit, all the connected drives (230 V) can
be drive central closed.
Note: The drives goes only as long as the key switch is pressed and hold.
When not operating the drives stop.
To drive up the drives again, a vent switch 230 V must be connected in each driving group.
wind-/rain detector
rain detector
drives 230 V
control unit 1 (Master)
230 V AC
key switch 24 V
control unit 1 (Master)
CLOSE
key switch 24 V
34
drives 230 V
vent switch
230 V
bus
line
control unit 2 (Slave)
230 V AC
DIP switch
8 = ON
1 2 3 4 5 6 7 8 9 10 11 12
control unit 2 (Slave)
drives 230 V
vent switch
230 V
bus
line
control unit 3 (Slave)
230 V AC
DIP switch
6 = ON
8 = ON
1 2 3 4 5 6 7 8 9 10 11 12
control unit 3 (Slave)
Bus
bus line
drives 230 V
vent switch
230 V
bus
line
control unit 4 (Slave)
230 V AC
DIP switch
7 = ON
8 = ON
1 2 3 4 5 6 7 8 9 10 11 12
control unit 4 (Slave)
Bus
01/13424999503

Werbung

Kapitel

Inhaltsverzeichnis
loading

Verwandte Produkte für STG-BEIKIRCH WRZ 40M-4G

Inhaltsverzeichnis