Herunterladen Inhalt Inhalt Diese Seite drucken

Drainage Piping Work; Electrical Work - Mitsubishi Electric MXZ-8B140 Installationshandbuch

Air-conditioners outdoor unit
Vorschau ausblenden Andere Handbücher für MXZ-8B140:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 16
5. Installing the refrigerant piping
I
F
LO
HI
G
H
Freon cylinder
Scale
Valve
3-way joint
Vacuum pump
System analyzer
Lo-knob
Fig. 5-12
Fig. 5-13

6. Drainage piping work

Outdoor unit drainage pipe connection
When drain piping is necessary, use the drain socket or the drain pan (option).
Drain socket
Drain pan

7. Electrical work

[1] Basic systems
OC
BC
(5-branch type)
A
B
C
IC
IC
IC
RC
RC
R
C
* For details about connecting the wires for the P100 indoor unit, refer to the
installation manual of the Branch box (PAC-AK52BC).
10
J
K
L
M
N
C
D
C
E
A
B
Hi-knob
To branch box
Outdoor unit
Stop valve
Liquid pipe or high-pressure pipe
Gas pipe or low-pressure pipe
Service port
* The figure to the left is an example
only. The stop valve shape, serv-
ice port position, etc., may vary
according to the model.
* Turn section
only.
(Do not further tighten sections
and
together.)
Charge hose
Service port
PAC-SG61DS-E
PAC-SG64DP-E
OC: Outdoor unit
BC: Branch box
IC: Indoor unit
RC: Remote controller
BC
(3-branch type)
D
E
A
B
C
IC
IC
IC
IC
IC
R
R
R
R
R
C
C
C
C
C
Evacuation (Fig. 5-12)
Evacuation should be made from the service port provided on the outdoor unit's stop
valve to the vacuum pump commonly used for both liquid or high-pressure pipe and
gas or low-pressure pipe. (Make evacuation from both liquid or high-pressure pipe
and gas or low-pressure pipe with the stop valve closed.)
Remember: Never carry out air purge by refrigerant.
Warning:
When installing or moving a unit to another place, do not mix anything other than
specified refrigerant into the refrigeration cycle. If air is mixed, the refrigeration
cycle may obtain abnormally high pressure, resulting in a burst pipe.
* A high-precision gravimeter measurable up to 0.1 kg should be used. If you are unable
to prepare such a high-precision gravimeter, you may use a charging cylinder.
Note:
• Use a gauge manifold, changing hose, and other parts for the refrigerant
indicated on the unit.
• Use a gravimeter. (One that can measure down to 0.1 kg)
Precautions when using the charge valve (Fig. 5-13)
Do not tighten the service port too much when installing it, otherwise, the valve core
could be deformed and become loose, causing a gas leak.
After positioning section
in the desired direction, turn section
it.
Do not further tighten sections
and
OC
BC
(5-branch type)
A
B
C
IC
IC
RC
RC
only and tighten
together after tightening section
.
Note:
The indoor units can be connected
to any of the 5 connectors (5-branch
type) or 3 connectors (3-branch type)
of the branch box.
BC
(3-branch type)
D
E
A
B
C
IC
IC
IC
R
R
R
C
C
C

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Mxz-8b160vaMxz-8b160ya

Inhaltsverzeichnis