Herunterladen Inhalt Inhalt Diese Seite drucken

Finishing; Connection Pipe, Cable And Drain Hose; Installing Front Cover - Fujitsu Airstage ASYA18GACH Installationsanleitung

Innengerät (wandmontierter typ)
Vorschau ausblenden Andere Handbücher für Airstage ASYA18GACH:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 18

8. FINISHING

Before performing this section, perform a sealing test. (Refer to the installation Manual for
the outdoor unit.)
] 1

8.1. Connection pipe, cable and drain hose

Insulate the drain hose, if necessary, to prevent it from freezing.
(1) Insulate between pipes.
• For
1
Rear,
2
Right and
3
Bottom piping, overlap the connection pipe heat insulation
and indoor unit pipe heat insulation and bind them with vinyl tape so that there is no
gap.
• For
4
Left bottom piping,
5
Left piping,
the connection pipe heat insulation and indoor unit pipe heat insulation together and
bind them with vinyl tape so that there is no gap.
(
Rear,
Right and
Bottom piping)
1
2
3
Overlap the insulation.
Connection pipe
(heat insulation)
Bind the pipes together so
that there is no gap.
(For
Left bottom piping,
Left piping,
4
5
• Wrap the area which accommodates the rear piping housing section with cloth tape.
• Bind the connection cable with vinyl tape.
• Bundle the piping and drain hose together by wrapping them with cloth tape over the
range within which they fi t into the rear piping housing section.
Connection pipe
Cloth tape
(Accessories)
Connection cable (Power supply cable)
Vinyl tape
Connection cable (Transmission and Remote controller cable)
Wrap with cloth tape
Pipe
Drain hose
(2) Temporarily fasten the connection cable along the connection pipe with vinyl tape.
(3) Fasten the connection pipe to the outside wall with a saddle, etc.
(4) Fill the gap between the outside wall pipe hole and the pipe with sealer so that rain
water and wind cannot blow in.
(5) Fasten the drain hose to the outside wall, etc.
Saddle*
Pipe
GOOD
Drain
hose
Lifted up
Saddle
] 1
9373370147-01_IM.indb 14
9373370147-01_IM.indb 14
6
Center piping and
7
Left rear piping, butt
Indoor unit pipe (heat insulation)
Vinyl tape
Center piping and
Left rear piping)
6
7
Indoor unit pipe
Wrap with cloth tape.
Pipe
Cloth tape
Outside wall cap*
Sealer putty*
Wall
(Outdoors)
*Field supply
PROHIBITED
Wave
End in water

8.2. Installing front cover

Fix the indoor unit
(1) Please remove the spacer.
Indoor Unit
Remove
(2) Hook the fi ttings of the indoor unit to the 2 bottom hooks while lowering the unit and
pushing it against the wall.
Indoor unit
Front panel installation.
(1) First, fi t the lower part of the front panel, and insert top and bottom hooks. (Top center
and both sides)
(2) Attach the 6 screws.
(3) Attach the intake grille.
Intake grill installation.
(1) The fi xing axle of the intake grille is installed on the front panel.
(2) Lay down the intake grille.
Top holes (2 sides)
Top hole (center)
Indoor unit
Top hooks (2 sides)
(4) Close the intake grille.
Panel
Spacer
Top hooks
Bottom hook
Top hook (center)
Top hooks (2 sides)
Intake grille
En-14
7/12/2012 4:48:46 PM
7/12/2012 4:48:46 PM

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis