Herunterladen Inhalt Inhalt Diese Seite drucken

Tunze Turbelle nanostream 6020 Gebrauchsanleitung Seite 19

Vorschau ausblenden Andere Handbücher für Turbelle nanostream 6020:
Inhaltsverzeichnis

Werbung

Commissioning only for 6040
Plug the connector from the power supply (1)
into the appropriate socket (2) on the Turbelle®
controller, then connect the power supply to the
mains outlet (3).
Additional pump controllers (4) or a Multicontroller (5)
can be connected to the upper socket of the
Turbelle® controller.
More detailed connection information for the
Multicontroller can be obtained from the respective
instruction manual.
Automatic shut-off
The pump will be stopped immediately in case of
a blockage. After the blockage has been removed,
the pump will start up automatically after a delay
of 20 seconds. The pump controller is thermally
protected. The power supply is protected against
short circuits and thermal overload.
Mise en service uniquement pour 6040
Raccordez le câble de l'alimentation secteur (1)
dans la prise correspondante (2) du Turbelle®
controller puis branchez l'alimentation sur le
secteur (3).
La connexion en partie haute du Turbelle®
controller est prévue pour le raccordement d'une
pompe supplémentaire avec Controller (4) ou d'un
Multicontroller (5).
Vous trouverez plus d'informations concernant le
raccordement de Multicontroller dans les notices
respectives.
Arrêt automatique
En cas de blocage, la pompe est immédiatement
mise hors service. Après suppression de ce
blocage, elle redémarre automatiquement avec
une temporisation de 20 secondes. Le pilotage
de la pompe possède une protection thermique.
L'alimentation secteur est protégée contre les
courts-circuits et les surcharges thermiques.
19

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Turbelle nanostream 6040 electronic

Inhaltsverzeichnis