Herunterladen Inhalt Inhalt Diese Seite drucken

Sicherheitsvorkehrungen; Safety Warning; Maintenance - Vitavia IDA 3300 Montageanleitung

Vorschau ausblenden Andere Handbücher für IDA 3300:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 6
1. PLEASE READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY BEFORE ASSEMBLING YOUR GREENHOUSE.
2. Sharp edges and corners can cause injury. Always wear protective glasses, gloves, shoes and headgear when handling the aluminium profi les, glass and
polycarbonate sheets. Broken glass is a safety hazard – always clear up immediately and dispose of with care.
3. The product you have purchased is intended only for the growing of plants and should only be used for this purpose. When used for other purposes we
will take no responsibility.
4. It is recommended that this greenhouse is assembled by two people.
5. Should you encounter diffi culties constructing this house, or in fi tting the glass or polycarbonate sheets, please contact your retailer
– do not use force!
SITE SELECTION
Always try to select a sunny location, sheltered
from the wind as much as possible.
IMPORTANT
Before assembling your new greenhouse,
please check that all parts in the provided list
are included. Please take each bundle out of
the packaging in order to identify the parts
better.
It is important that the opened bundles do not
get mixed with one another.
If something is missing please contact your
retailer.
NECESSARY TOOLS
Screw drivers (Normal and Crosshead PH2),
10 mm socket spanner or wrench, 10 mm
combination spanner, knife, measuring stick,
spirit level, Accu-drill with adjustable torque.

MAINTENANCE

The greenhouse should be thoroughly washed
with a gentle detergent occasionally. Please
check that the detergent used does not react
aggressively with aluminium or the glass fi xing
clips.
Ensure that the upper and lower door tracks
are cleaned regularly to avoid a build up of
debris.
0. BASE
The base must be exactly square
Important!
and level. A zinc-coated steel base is available
as an accessory for all greenhouse models.
(
Only when the greenhouse has to
Attention!
be located in a very windy and unprotected
location: Drill through both the profi le at the
base of the greenhouse and the steel base,
4

SICHERHEITSVORKEHRUNGEN

Safety Warning

Assembly Instructions
and connect them with nuts and bolts.)
If you would rather construct your own stone
or concrete foundation, please follow the
dimensions specifi ed in diagram 0. Treated
wooden beams at least 18 mm high and not
more then 32 mm wide should be positioned
between the stone/concrete foundation and
the aluminium frame, and connected to the
foundation with 50 mm long bolts (not pro-
vided).
Foundations must extend down below the frost
level.
Diagrams in a single frame show the
view from inside the greenhouse. Those
enclosed in a double frame show the
view from outside the greenhouse.
1. FRONT
Lay all of the parts on the fl oor and connect
them loosely.
Loosely connect the corner plates (1092) on
the upper corners.
2. ASSEMBLY
Connect the gable end bars (4086 / 4087)
between the eaves door track (4090) (2.1) and
the vertical wall bars (4088 / 4089) (2.3). Now
connect the ridge bar (4052) (2.3) and then sill
bars (1022) (2.4 & 2.5).
Loosely connect the corner plates (1092)
above the eaves (2.1) and at the roof ridge
(2.3).
Connect the side glazing bars (4091 / 4092),
including two extra bolts in each glazing bar.
Connect side braces (4094).
Connect the roof glazing bars (4056) between
the eaves (2.2) and the ridge bar (2.3).
Please use the washers (7395) at all connec-
tion points to eaves door track (4090) (2.1 &
2.2).
It is necessary to include one extra bolt in the
glazing bars (4056) at this point, to later
connect the roof vent.
3. ASSEMBLY ON WALL
Now position your greenhouse on the pre-
pared base/foundation and connect loosely.
Adjust the greenhouse until it is completely
square and tighten all bolts.
Please do not over tighten.
Ensure that the sides are perfectly vertical.
Note the pre-drilled holes in the vertical wall
bars (4088 / 4089)) and ridge bar (4052) and
mark them on the wall.
Remove the frame from the base.
Drill 6 mm holes in the wall as marked and
place the provided wall plugs (2003) in the
wall. (The drill is not included).
Replace the frame on the base and connect it
to the wall using screws (2002) (3.1) & (3.2).
Finally connect the frame to the base if desired.
4L and 4R. DOORS
Attention: Do not stand the assem-
bled doors on the door gliders
(1014) to avoid damaging them.
Push the door gliders (1014) onto both ends of
door bar (1060) (4.1).
Assemble the doors as shown in diagram 4.
Connect door rollers (1015) to the door bar
(1062) using bolt (1004), washer (1009) and
nut (1007) (4.4).
007.02.1012

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis