After preparing the pit the trampoline can be put on the con-
crete L - shape stones. The remaining gap between the Kids
Tramp and the surrounding area needs to be filled.
The upper 5 – 10 cm should be filled with humus so
that there are no gaps between the trampoline and its sur-
rounding ground.
If the ground does not drain naturally (water - impermeab-
le), suitable drainage must be installed. In this case the pit
Intersection scheme
5
split 2 – 5 mm
possible suspension of the bed
air space
40
concrete L - shape
stones
washed grit
lean concrete
16 / 32 mm
should be 15 cm deeper to allow a drainage pipe connected
to a suitable outflow (e.g. the local sewerage system). After
that you disperse a combined frost protection and base
layer on the whole area, depth: 15 cm.
Finally, you concrete the 8 concrete L - shape stones.
1.60
1.50
70
concrete L - shape
stones
lean concrete
5
split 2 – 5 mm
40
25