2. Separate the legs pulling them apart. Keep the central lock up.
Otherwisehandrails will notflt inthe right place(seeflg. 2).
Note! So that the sides of the cot / handrails are properly
blocked,
the central
upwards.
The baby rails will not lock when the floor
is unfolded
3. Pull the middle part of each top rail covered with material
so that they fit into place. Start with the longer rails, and then
the shorter ones (see flg. 3).
4. Push the middle lock until the surface is complete y flat
(you will hear the click sound) (see flg. 4).
5. Place the mattress in the baby bed (see fig. 5, 6).
Fasten the mattress
of the mattress (there are special openings in the floor for
fastening).
Base
installation
The base must be attached using the zipper. Once the base
is attached,
cover the zipper with a Ve cro pad. Slide the
reinforcement
them (they must be paired properly). Place the mattress onto
the tube
reinforced
blockade
using Ve cro on the two short sides
tubes
into
the
base and fasten
of the floor
must
sewn
handles
it with Velcro.
be raised
and
connect
lionelo