Herunterladen Inhalt Inhalt Diese Seite drucken

GEZE Powerturn Serviceanleitung Seite 12

Integrierter rauchschalter
Vorschau ausblenden Andere Handbücher für Powerturn:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation
Screw the plate (5) to the bracket (3) using 2 x
X
M5 × 10 screws (4).
Fix the bracket (8) for the smoke switch to the
X
plate (5) using the screw M5 × 10 (7).
Stick the Ü-symbol enclosed (6) in place.
X
Insert the smoke switch (10) in such a way that
X
the sensing channel is aligned to the aperture
in the bracket (8) and the smoke can flow
through (arrows).
Thread the cable (9) through the slot in the
X
side part and connected in compliance with
the Powerturn wiring diagram.
Place the cover (12) in such a way that the
X
slots (11) are aligned with the smoke channel
(13).
12
Powerturn smoke switch unit
4
5
6
7
9
8
11
12
8
10
13

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis