Herunterladen Inhalt Inhalt Diese Seite drucken

Finish The Installation; Frigo Top 24 Condenser Cover; Initial Operation - Webasto Frigo Top 24 Rt-D Einbauanweisung

Vorschau ausblenden Andere Handbücher für Frigo Top 24 RT-D:
Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 18
10

Finish the installation

See the workshop manual of the control device for:
u
How to program parameters.
u
Description of the parameters.
u
Used abbreviations for the parameters.
u
Standard settings of the parameters.
10.1

Frigo Top 24 condenser cover

R134a
Fig. 32 Place cover of the Frigo Top condenser
1.
Place cover.
2.
Tighten bolts.
Description
INOX screw torx M6x20
(8x)
Washer 7x19x2 (8x)
10.2

Initial operation

On initial operation, carry out the following checks:
ü General performance check:
u
Check the fan speed and the airflow.
u
Check the air temperature.
ü High- and low-pressure check:
u
Check the gas working pressures and temperatures.
ü Correct operation check:
u
Check the power consumption.
u
Check that there are no abnormal noises.
u
Check that there are no abnormal vibrations.
u
Check the management of condensed water.
6248543A Frigo Top 24 RT-D _ RT-DG ML
R452A
Max. torque [Nm]
3
Finish the installation | 10
13 / 84
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Frigo top 24 rt-dg

Inhaltsverzeichnis