INSTALLATION
Installation
INSTALLATION
6.
Installation
6.1
Installation site
The ISG is designed for wall mounting and is installed between
your router and your heat pump/integral ventilation unit.
Note
The ISG connects to the interface for the second pro-
gramming unit.
f Observe the operating and installation instructions
f
of your heat pump or integral ventilation unit.
Material losses
!
The installation site must be dry and protected against
frost.
f Observe the application limits in the chapter "Spec-
f
ification".
6.2
Wall mounting
f Mount the ISG on a suitable wall:
f
22
| ISG web
f Push the ISG to the right, until you feel it latch into the
f
retainer.
6.3
Power supply
Note
The ISG connects to the interface for the second pro-
gramming unit or the remote control of your heat pump/
integral ventilation unit.
If there is only one interface, the ISG connects in parallel
to the CAN BUS as an additional programming unit.
f Use the CAN BUS cable supplied to connect the ISG to your
f
heat pump/integral ventilation unit via the CAN interface.
When doing so, observe the operating and installation in-
structions of your heat pump/integral ventilation unit.
www.stiebel-eltron.com