Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Connection; Voltage Change; Final Setup Operations - SILANOS N600F Gebrauchsanweisung Und Installation

Industriegeschirrspüler
Vorschau ausblenden Andere Handbücher für N600F:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 33
Attention: in order to reach best performance and output rates all appliances must be
supplied with hot water 50 °C. If the machine is supplied with cold water, the production
capacity of the appliance is reduced in relation to the temperature itself.
Drain: all appliances are equipped with a pipe for connection to a drain trap in the floor.
Attention: check that there are no bends or constrictions along the entire lengths of the
filling and discharge pipes.
4.2

ELECTRICAL CONNECTION

The appliance is to be connected to a wall master switch of suitable power, provided with a
thermal release and the relevant switch unit. Three-phase models must be provided with a
power cable of suitable ength, H07RN-F type.
Attention: the grounding system is to be connected in full compliance with the current
regulations. Moreover, the appliance is to be set within an equipotential system by
connecting the screw located on the base and marked by the relevant sign. The
Manufacturer will not be liable for any direct or indirect damage arising from non-
compliance with the said regulations.
Before wiring the appliance assure that:
- the operating voltage rate corresponds to the rate shown on the appliance rating plate;
- wiring is carried out in accordance with wiring diagram.
4.2.1

Voltage change

Voltage may be changed from 400V/3+N 50Hz to 230V/3 50Hz if appliance model is
three-phased. In order to change voltage, the neutral wire in the terminal board inside the
appliance must be connected to phase L3 and the boiler resistor must be connected as shown
on the wiring diagram.
5

FINAL SETUP OPERATIONS

- Turn water supply tap on and switch the wall master switch on.
- Make sure that there are no foreign bodies inside the dishwasher.
- Check that all the covering panels are fitted.
- Check that the overflow pipe (Fig. 10 - Pos. H) is correctly positioned and secured.
- Make sure that the filter (Fig. 10 - Pos. G) and the ring nut are firmly and correctly set in
place.
- Check that the surface filters are fitted correctly in their places (Fig. 6).
- Make sure that the door is closed.
- Move the main switch 1 to the 1 position. The power pilot light 2 will come on and at the
same time the boiler andthe tank will start to fill and the heating resistances will come on.
ENGLISH
22

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis