Herunterladen Diese Seite drucken

Sunny Health & Fitness PERFORMANCE INTERACTIVE Serie Benutzerhandbuch Seite 12

Vorschau ausblenden Andere Handbücher für PERFORMANCE INTERACTIVE Serie:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 47
BATTERY INSTALLATION & REPLACEMENT
Battery
Cover
BATTERY INSTALLATION
1. Take out 2 AAA batteries from meter box.
2. Press down on the buckle of battery cover on the Meter (No. 66), then remove battery cover.
3. Install 2 AAA batteries into the battery case on the back of the Meter (No. 66). Pay attention to
the battery + and – poles before installing.
4. Press down on the buckle of battery cover, then put the battery cover back to the back of the
Meter (No. 66).
The installation is complete!
BATTERY REPLACEMENT
1. Press down on the buckle of battery cover on the back of the Meter (No. 66), then remove
battery cover.
2. Remove the 2 old AAA batteries in the battery case and install 2 new AAA batteries into the
battery case on the back of the Meter (No. 66). Pay attention to the battery + and – poles before
installing.
3. Press down on the buckle of battery cover, then put the battery cover back to the back of the
Meter (No. 66).
The replacement is complete!
BATTERY DISPOSAL
Dispose the batteries according to the laws and regulations of your local region. Some batteries
may be recycled. When disposing or recycling, do not mix battery types.
Battery
66
11

Werbung

loading

Diese Anleitung auch für:

Performance interactive sf-rb420031