Herunterladen Diese Seite drucken

STIEBEL ELTRON DEL 18/21/24 SL electronic LCD Bedienung Und Installation Seite 29

Elektronisch geregelter durchlauferhitzer
Vorschau ausblenden Andere Handbücher für DEL 18/21/24 SL electronic LCD:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

InStaLLatIon
Installation
oversink installation
2
1 Cold water inlet
2 DHW outlet
10. installation
10.1 standard installation
- Electrical connection in the lower section of the appliance for
installation on unfinished walls
- Water connection for installation on unfinished walls
- For the appliance with adjustable connected load, the middle
load is preset.
For further installation options, see chapter "Installation options".
f Open the appliance.
f
f Remove the back panel by pressing the two locking hooks
f
and pulling the lower part of the back panel forwards.
www.stiebel-eltron.com
1
f Use the installation template to mark out the holes for drill-
f
ing. If the appliance is to be installed with water connections
for finished walls, also mark out the fixing hole in the lower
part of the template.
f Drill the holes and secure the wall mounting bracket with
f
2 screws and 2 rawl plugs (screws and rawl plugs are not
part of the standard delivery).
Note
If you are installing the appliance with flexible water
connections, also secure the back panel with a screw.
f Fit the wall mounting bracket.
f
160
30
1 Installation aid
f Prepare the power cable.
f
making the water connection
Material losses
!
Carry out all water connection and installation work in
accordance with regulations.
f Seal and insert the twin connectors.
f
1
DEL SL electronic LCD |
29

Werbung

loading

Diese Anleitung auch für:

Del 27 sl electronic lcd