Herunterladen Diese Seite drucken

Atag Zone Manage Installationsanleitung Seite 13

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

preparing the boiler for operation
Addressing the product HMI
1) Find menu 0 "Network" then confirm with the
OK button. Select sub-menu 03 "Interface
system" then confirm with the OK button.
2) Select sub-menu 030 "Zone number" then
confirm with the OK button and assign the
configuration code to the product HMI:
-
0 no setting zone (Product HMI not assigned
to any zone)
Meaning of the LEDs
GREEN LED (left)
Indicator light off
Indicator light on
Indicator light flashing
GREEN LED (centre)
Indicator light off
Indicator light on
Indicator light flashing
RED LED (right)
Indicator light off
Indicator light on
Then confirm with the OK button.
3) Return to the main display by repeatedly
pressing the
At this stage, the module is operational with the
factory parameters.
Main supply OFF
Main supply ON
Main supply ON, operation in manual mode
No ATAG zone communication
ATAG zone communication present
ATAG zone communication initialisation
No operating faults
Presence of one or more operating faults
button
GB
13

Werbung

loading