5. To switch the raw sensor signal to terminals z14 and z16 place the jumpers as shown in b).
If the jumpers are set as shown in a) then the dynamic portion of the sensor signal is applied
on terminals z14 and z16.
6. Place the controller board back on the main board and secure it with the four screws. Now,
the raw sensor signal is on the connection strip.
Installation
1. Check the slot wiring prior to installing the monitor.
2. Push the A6125 monitor into the prepared slot and press it with light pressure into the plug
connector.
3. Hand tighten the two anchoring screws on the front panel to secure the monitor.
Any other information, e. g. shielding and grounding, configuration of the monitor, etc., can be
found in the direction for use "Bearing Vibration Monitor A6125", order number: 6110−90069.
1.6
Technical Data
Only information with tolerances and limit values are considered as binding data. Data without
tolerances or error limits are provided as information only. We reserve the right to make technical
changes − particularly to the software.
All of the following information applies uniformly for channel 1 and channel 2, if not otherwise
specified.
SENS1
AC1
z14:
J2
z16:
SENS2
AC2
a)
SENS1
AC1
z14:
z16:
SENS2
AC2
b)